TTN · Phase 1

Tennessee Network

Volunteer-built 6-meter FM backbone linking AllStarLink nodes across Tennessee. Solar-primary sites, GPS-disciplined timing, sovereign infrastructure.

4Live Sites
2Building
3Planned
9Total Sites
Coverage

Estimated Coverage — Phase 1

TTN Phase 1 Estimated Coverage Map

Phase 1 estimated RF coverage · 6-meter FM · Tennessee · 2026 · Updated as sites come online

Site Locations

Interactive Site Map

Sites

Phase 1 Sites — 9 Total

WB4SKY ● LIVE
Chattanooga
TN
446.1500 / 446.1500 · PL 88.5 · 70cm
25ft
K4CP ● LIVE
Cookeville
Cookeville, TN · Putnam Co.
53.8500 / 52.8500 · PL 107.2 · 6m
170ft
WA4ADT ● LIVE
Memphis
Memphis, TN · Shelby Co.
53.7300 / 52.7300 · PL 107.2 · 6m
25ft · Grid
W4BWW ● LIVE
TTN
New Market, TN
AllStar 65392
◐ BUILDING
Beaver Ridge, Knoxville
TN
◐ BUILDING
TN
New Market, TN
120ft Rohn 25 · Solar, Generator
○ PLANNED
Holcomb
MS
64ft · Solar Primary
KW4ME ○ PLANNED
Middleton
TN
145.3300 / 144.7300 · PL 107.2 · 2m
100ft · Solar Hybrid
○ PLANNED
Sneedville
TN
25ft
Roadmap

Build Phases

1
Phase 01 · Active
Foundation
2025 — 2026
  • 6m FM repeater backbone — statewide
  • AllStarLink linked via IPSec VPN
  • Solar-primary sites
  • GPS-disciplined NTP timing
  • Sensor fabric — ESP32 per site
  • Simulcast v1 — GPS-timed 2-site test
  • Live audio streaming — Icecast
  • ARDC grant submission — Sept 1 2026
2
Phase 02 · Planned
Sovereignty
2026 — 2029
  • ARDEN microwave backhaul — Tier 1
  • UHF point-to-point links (TK-890)
  • Simulcast across full network
  • Kraken DF at tower sites
  • DVSwitch — DMR / P25 / YSF
  • URI201 controller standard
  • Zero commercial ISP dependency
3
Phase 03 · Long-term
Full Mesh
2029+
  • Full ARDEN mesh — all sites
  • LoRaWAN sensor fabric
  • NooElec APRS — deepest fallback
  • MTEARS e-com integration
  • GPS simulcast — full network
  • Emergency infrastructure ready